Rody Creek Channel Stabilization Between 72nd Street East and Pioneer Way East

About the Project


Pierce County has initiated this project to reduce sediment input and loading into the Rody Creek channel by stabilizing certain areas of ravine slope erosion. Additionally an objective is to reduce transport of sediment deposits through the Rody Creek channel upstream of the existing culvert crossing under Pioneer Way East.  

Some actions that will be taken for this project will utilize fish friendly natural wood materials and log structures to reduce sediment transport. Several channel spanning log structures will be placed, to reduce the movement of sediment into the receiving downstream channel reach (below Pioneer Way East). The project will also help to address Clarks Creek TMDL goals and objectives by helping to improve water quality to the receiving Clarks Creek stream system.

Contact

Randy Brake
Project Manager
(253) 798-4651
[email protected]

Timeline

  • Beginning Summer 2023: Property easement acquisitions
  • Fall 2024: Final engineering design  
  • Anticipated Summer 2025: Construction

Note: The timelines noted above are subject to change.

Project Updates


Please fill out our contact form to stay up to date with the Rody Creek Channel Stabilization project.

Project Location

The proposed project is located on the west side of Pioneer Way East and east of Bentley Road East. The project site lies within the Rody Creek channel and ravine area.

D191 Rody Creek Project Site Map

Rody Creek

Rody Creek (2)
Rody Creek (4)
Rody Creek (5)
Contact Us