94th Avenue East - 144th Street East to 136th Street East (CRP 5533)

What’s Happening

Engineering: We have completed the field survey of the corridor, vertical alignment design, storm drainage treatment and conveyance design, and updated the project cost estimate.



  Contact Information

Letticia M. Neal, P.E.
Transportation Improvement Section Manager
Phone: (253) 798-7041

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409


About the Project

  1. Overview
  2. Project Timeline


Planned improvements to 94th Avenue East from approximately 850 feet south of 144th Street East to 300 feet south of 136th Street East (CRP 5533) are intended to increase capacity and relieve traffic congestion, and include the following:

  • Expanding to five lanes with a two-way left-turn lane.
  • Adding concrete curbs, gutters and sidewalks.
  • Adding street lighting.
  • Adding a new permanent traffic signal at the 94th Avenue East / 144th Street East intersection.
  • Adding an enclosed storm drain system, as well as stormwater treatment facilities.