78th Avenue East / 192nd Street East (CRP 5641)

What’s Happening

Engineering: We’ve completed preliminary engineering and developed right-of-way plans for a project (CRP 5641). The project development has been placed on hold pending future traffic needs.



  Contact Information

Letticia M. Neal, P.E.
Transportation Improvement Section Manager

Phone: (253) 798-7041

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409


About the Project

78th Avenue East / 192nd Street East
  1. Overview
  2. Project Timeline


Planned improvements to the intersection of 78th Avenue East / 192nd Street East (CRP 5641) are intended to increase the efficiency of the intersection and improve safety. Improvements would include the following:

  • Reconstructing the existing traffic signal system
  • Installing street lighting at the intersection
  • Constructing left-turn lanes on 78th Avenue East
  • Constructing cement concrete curb, gutter, and sidewalk on 78th Avenue East
  • Reconstruction of the storm drainage system

Design work on the project has stopped now that right-of-way plans have been completed. No additional work, such as right-of-way acquisition or construction for the project is anticipated in the foreseeable future.