Olson Drive KPN / 92nd Street KPN - Key Center Sidewalks (CRP 5863)

What's Happening


Engineering: We're completing the engineering for the project including storm drainage conveyance design and final construction plans, specifications and cost estimates.

About the Project


Planned improvements to Olson Drive KPN / 92nd Street KPN from approximately 425 feet west of Key Peninsula Hwy KPN to 75 feet west of Key Peninsula Hwy KPN (CRP 5863) are intended to improve pedestrian accessibility and sidewalk connectivity in the project area and include the following:
  • Widening the roadway to include asphalt paved shoulders
  • Adding concrete curbs, gutters, and sidewalks.
  • Adding an enclosed storm drain system, as well as stormwater treatment facilities.

Project Timeline


January 2018 to March 2018: Completed field surveys.

March 2018 to February 2019: Completed preliminary engineering and right-of-way plans.

February 2019 to June 2020: Right-of-way acquisition, environmental documentation, construction plans, specifications, estimates.

June 2020: Construction begins.