Bridge #34195-A - Patterson Road East Culvert Replacement (CRP 5868)

What’s Happening

Engineering: Pierce County has completed a field survey and is in the preliminary design stage.

Land: Right-of-way needs will be evaluated.

Environmental: Necessary environmental permits will be obtained.

Image of the project vicinity map.
Project photo of one end of the existing culvert.

About the Project

Planned improvements at Patterson Road East (CRP 5868) at its crossing with an unnamed stream are intended to replace the existing culvert, including the following:

  • Removing the existing 42" culvert.
  • Constructing a concrete box culvert. This structure will have two lanes with paved shoulders.
  • Patterson Road East will remain open during construction.

Project Timeline

Fall 2018 to Winter 2020: Surveying, preliminary engineering and right-of-way plans. 


Winter 2020 to Spring 2022: Right-of-way acquisition, environmental documentation, construction plans, specifications and estimates.

Summer 2022: 
Construction

Contact Us


Kraig Shaner, P.E.

Bridge Supervisor

Phone: (253) 798-2764

Address:

2702 S 42nd Street, Suite 109

Tacoma, WA 98409