Canyon Road East - 72nd Street East to Pioneer Way East (CRP 5903)
What's Happening
Engineering: We are beginning the preliminary engineering for this project and will be reviewing the existing site conditions to help define the planned improvements. We are currently evaluating roadway alignment and storm drainage treatment options.
Survey: County staff will be gathering field data of the project area.
Expanding to four lanes with left turn lanes as needed.
Adding concrete curbs, gutters and sidewalks.
Adding street lighting.
Adding an enclosed storm drain system, as well as stormwater treatment facilities.
Project Timeline
November 2020: Completed field surveys.
November 2020 to December 2022: Complete preliminary engineering.
2023 and Beyond: Complete preliminary engineering, develop right-of-way plans, begin final engineering, right-of-way acquisition, and construction. A schedule for completion of this work has not yet been determined.
Darin S. Cavanagh, P.E. Design Supervisor Phone: (253) 798-2284
Address: 2702 S 42nd Street, Suite109 Tacoma, WA 98409