Bridge #6163-A - Harts Lake Road South / Horn Creek (CRP 5916)
What’s Happening
Engineering: Pierce County has completed a field survey and is in the preliminary design stage.
Land: Right-of-way needs will be evaluated.
Environmental: Necessary environmental permits will be obtained.
About the Project
Planned improvements to Harts Lake Road South at its crossing with Horn Creek (CRP 5916) are intended to replace the existing culvert, including the following:
Removing the existing 54" culvert.
Constructing a concrete structure. This structure will have two lanes with paved shoulders.
Approximately 550 feet of stream regrading and realignment.
Project Timeline
2023: Begin preliminary engineering, right-of-way plans and environmental documentation. Construction date to be determined.
Gary Amundsen, P.E. Bridge Engineering Supervisor Phone: (253) 798-2271
Address: 2702 S 42nd Street, Suite 109 Tacoma, WA 98409
How can we help?
Pierce County wants to hear from you. Please select one of the following to talk to elected officials and staff, or to report problems in our community.