Bridge #6163-A - Harts Lake Road South / Horn Creek (CRP 5916)

What’s Happening

Engineering: Pierce County has completed a field survey and is in the preliminary design stage.


Land: Right-of-way needs will be evaluated.


Environmental: Necessary environmental permits will be obtained.

Image of the project vicinity map.
Image of project photo.

About the Project

Planned improvements to Harts Lake Road South at its crossing with Horn Creek (CRP 5916) are intended to replace the existing culvert, including the following:


  • Removing the existing 54" culvert.
  • Constructing a concrete structure. This structure will have two lanes with paved shoulders.
  • Approximately 550 feet of stream regrading and realignment.

Project Timeline

Fall 2019 to Spring 2023: Surveying, preliminary engineering and right-of-way plans.


Spring 2023 to Spring 2025: Right-of-way acquisition, environmental documentation, construction plans, specifications and estimates.


Summer 2025: Construction begins.

Contact Us


Gary Amundsen, P.E.

Bridge Supervisor

Phone: (253) 798-2271

Address:

2702 S 42nd Street, Suite 109

Tacoma, WA 98409