Canyon Road East - 106th Street East to 96th Street East (CRP 5735)

What’s Happening
Engineering: We’re beginning design for the project. Currently we are gathering information about the existing site conditions and initiating contact with utility companies.


Surveying: County surveyors will be in the area gathering field data of the project area.

Image of the project vicinity map.
Image of the project.

About the Project
Planned improvements to Canyon Road East from 106th Street East to 96th Street East (CRP 5735) are intended to enhance safety and relieve traffic congestion. The improvements would include the following:

  • Improve the traffic signal system at 104th Street East.
  • Expanding to add a two-way left-turn lane and additional turn lanes at the 104th Street East intersection.
  • Adding paved shoulders, cement concrete curb, gutter and sidewalk.
  • Adding street lighting.
  • Reconstructing the enclosed storm drain system, as well as stormwater treatment facilities.
Image of the project roadway section.

Project Timeline
May 2020 to 2022: Field data collection, preliminary engineering, environmental review, preliminary plans, estimate, and final right-of-way plans.


January 2022: Project placed on hold due to funding constraints and changes in project priorities.

Contact Us

Letticia M. Neal, P.E.

Transportation Improvement Section Manager

Phone: (253) 798-7041

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409