204th Street East / Eustis Hunt Road East (CRP 5886)

What’s Happening
Engineering: We are beginning the design engineering for the project which includes collecting field information, and creating right-of-way and construction plans.


Surveying: County surveyors will be in the area gathering field data for the project.

Image of the project vicinity map.
Google Earth image of the intersection.

About the Project
Planned improvements to 204th Street East and Eustis Hunt Road East Intersection (CRP 5886) are intended to increase the efficiency of the intersection, improve safety, and include the following:


  • Eastbound right turn-lane on 204th Street East.
  • Replacing the existing curb ramps with ones that meet the American Disabilities Act (ADA).
  • Adding a new traffic signal system.
Image of the proposed intersection layout.
Project Timeline

February 2021 to December 2022Create and finalize right-of-way plans, draft construction plans and a project estimate.


January 2022: Project placed on hold due to funding constraints and changes in project priorities.