2021 Road Safety - Guardrails (CRP 5918)

What’s Happening

Work to install guardrail along Alder Cutoff Road East began Oct. 4. Minor work was completed Jan. 18. Guardrail was installed along several sections of a 3.5-mile stretch along Alder Cutoff Road East located south of Eatonville. Please see the locations in the table below.

In mid-November, crews began installing guardrail along sections of Crescent Valley Drive Northwest and Rhodes Lake Road East. They replaced guardrail reflectors along a section of 214th Avenue East. Minor work was completed Jan. 18. Please see the locations in the table below

  Contact Information

Andrew Davis, P.E.
Construction Supervisor
Phone: (253) 798-6913

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409


About the Project

  1. Overview
  2. Contract Information
  3. Project Information
Image of the project vicinity map. Opens in new windowGroup 1: Crescent Valley Drive Northwest
(MP 11.00 to MP 11.03)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 2: Rhodes Lake Road East
(MP 4.67 to MP 4.90)
Install guardrail on the left side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 3: 214th Avenue East
(MP 3.25 to MP 3.33)
Replace the existing guardrail reflectors only.
Image of the project vicinity map. Opens in new windowGroup 4: Alder Cutoff Road East
(MP 5.12 to 5.20; MP 5.12 to 5.38)
Install guardrail on both sides of the roadway.
Image of the project vicinity map. Opens in new windowGroup 5: Alder Cutoff Road East
(MP 4.15 to 4.18)
Install guardrail on the left side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 6 & 7: Alder Cutoff Road East
(MP 3.19 to 3.29; MP 3.34 to MP 3.49)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 8: Alder Cutoff Road East
(MP 1.25 to MP 1.34)
Install guardrail on both sides of the roadway.
Image of the project vicinity map. Opens in new windowGroup 9: Alder Cutoff Road East
(MP 0.56 to MP 0.63)
Install guardrail on the right side of the roadway.
Image of the project vicinity map. Opens in new windowGroup 10: Alder Cutoff Road East
(MP 0.17 to MP 0.30)
Install guardrail on the right side of the roadway.