ADA (Americans with Disabilities Act) Improvement Program - 2023 (CRP 5934)
What’s Happening Engineering: We are preparing the final engineering for the project.
About the Project Planned improvements for the ADA Improvement Program - 2023 are intended to improve accessibility and sidewalk connectivity at various locations throughout the County, and include the following:
Removing and reconstructing existing curb ramps.
Adding new curb ramps where needed.
Evaluating sidewalks within the project area that do not meet ADA requirements.
The locations include:
Group 1: Tule Lake Road South (Spanaway Loop Road South to Ainsworth Avenue South)
Group 2: 136th Street East (99th Avenue Court East to 103rd Avenue East)
Group 3: 168th Street East (119th Avenue Court East to 122nd Avenue East)
Project Timeline
May 2021 to July 2021: Completed field surveys.
July 2021 to December 2022: Complete engineering and environmental documentation.
January 2023 to March 2023: Complete construction plans, specifications, and estimates.