Canyon Road East - Asphalt Overlay (CRP 5932)

What’s Happening

Planned improvements to Canyon Road East - Asphalt Overlay from 138th Street East to 116th Street East were completed on September 8, 2023.




  Contact Information

Andrew Davis, P.E.
Construction Supervisor
Phone: (253) 798-6913

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409


About the Project

  1. Overview
  2. Contract Information
  3. Project Timeline

Planned improvements to Canyon Road East - Asphalt Overlay from 138th Street East to 116th Street East resurfaced the roadway pavement and reconstructed curb ramps to current ADA accessibility standards. The improvements included the following:

  • Remove and repave the top 2-inches of asphalt concrete pavement from 138th Street East to 116th Street East.
  • Replace curb ramps out of ADA compliance at the 138th Street East, 136th Street East, 128th Street East, and 122nd Street East intersections along Canyon Road East.