Engineering: Pierce County is in the preliminary engineering stage.
Environmental: Necessary environmental permits will be obtained as needed.
The project involves resurfacing bridge decks at various locations throughout the County. The locations include:
Group 1: Bridge #17193-D
(10th Avenue South at
Clover Creek crossing)
Group 2: Bridge #25164-A
(Alder Cutoff Road East at
Little Mashel River crossing)
Spring 2022: Begin preliminary engineering, development of construction plans, specifications, and estimates.
Summer 2024: Begin construction.
Gary Amundsen, P.E.
Bridge Supervisor
Phone: (253) 798-2271
Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409