Engineering: Pierce County is in the preliminary engineering stage.
Environmental: Necessary environmental permits will be obtained as needed.
The project involves cleaning and painting bridge steel elements at various locations throughout the County. The locations include:
Group 1:
Bridge #17173-A
(16th Avenue South at
Lacamas Creek crossing)
Group 2:
Bridge #24164-B
(Groe Road East at
Little Mashel River crossing)
Group 3:
Bridge #5174-A
(304th Street East at
South Fork Muck Creek Trib crossing)
Group 4:
Bridge #16205-A
(45th Street East at
Lake Tapps Bankers Island crossing)
Spring 2022: Begin preliminary engineering, development of construction plans, specifications, and estimates.
Summer 2024: Begin construction.