2023 Asphalt Overlay Program - Various Locations (CRP 5940)
What’s Happening
Engineering: We are beginning the design engineering for the project which includes collecting field information and creating construction plans.
Environmental: Necessary environmental permits will be obtained.
Surveying: County surveyors will be in the area gathering field data for the project.
About the Project Planned improvements for the 2023 Asphalt Overlay Program involves resurfacing the existing pavement and upgrading existing curb ramps to meet ADA standards at various locations throughout the County. The locations are:
Group 1:
184th Street East
(86th Avenue East to Gem Heights Drive East)
Group 2:
Eatonville Cutoff Road East
(SR 161 to SR 7)
Group 3:
Bowman Hilton Road East
(SR 162 to 300 feet east of SR 162)
Group 4:
46th Avenue East
(Mathias Road East to 224th Street East)
Group 5:
Canyon Road East
(Clover Creek Bridge south of Military Road to Frederickson Industrial Park)
176th Street East
(MP 3.52 Bridge west of Canyon Road East to East Retail Drive)
Group 6:
192nd Street East
(22nd Avenue East to 38th Avenue East)
Group 7:
152nd Street East
(94th Avenue East to SR 161)
Group 8:
Steilacoom-Dupont Road Southwest
(Wharf Road to Intersection of East Drive)
Group 9:
Park Avenue South
(Tule Lake Road South to 121st Street South)
Project Timeline
May 2022 to March 2023: Complete field surveys, prepare construction plans, and contract provisions.