304th Street East - 73rd Street East to Webster Road East (CRP 5960)

What’s Happening
Engineering: We are beginning the design engineering for the project which includes collecting field information and creating construction plans.

Land: Additional right-of-way needs will be assessed.

Environmental: Necessary environmental permits will be obtained.

Surveying: County surveyors will be in the area gathering field data for the project.

Image of the project vicinity map.
Image of the project.

About the Project
Planned improvements to 304th Street East are intended to resurface and restore the roadway, and include the following:

  • Overlay the existing roadway.
  • Upgrade the guardrail at either end of the South Fork Muck Creek Tributary Bridge #5174-A.
  • Polyester-asphalt coating of Bridge #5174-A.
  • Installation of guideposts.

Project Timeline

March 2023 to April 2023: Complete field surveys.

May 2024: Advertise for construction bids.

Summer 2024: Construction expected to begin.