Bridge Deck Rehab - Mashel River, Puyallup River, Kapowsin Creek (CRP 5963)

What’s Happening

Engineering:  We are beginning the final engineering phase for the project which includes collecting field information and creating construction plans.

Environmental: Necessary environmental permits will be obtained as needed. 


  Contact Information

Gary Amundsen, P.E.
Bridge Engineering Supervisor
Phone: (253) 798-2271

Address:
2702 S 42nd Street, Suite 109
Tacoma, WA 98409


About the Project

  1. Overview
  2. Timeline

This project involves resurfacing bridge decks at various locations throughout the County. The locations include:

Group 1:
Bridge #24164-A
(Alder Cutoff Road East at Mashel River Crossing)
Image of the project vicinity map for group 1. Opens in new windowImage of the project for group 1. Opens in new window
Group 2:
Bridge #6195-A
(96th Street East at Puyallup River Crossing)
Image of the project vicinity map for group 2. Opens in new windowImage of the project for group 2. Opens in new window
Group 3:
Bridge #5175-C 
(Orville Road East at Kapowsin Creek Crossing)
Image of the project vicinity map for group 3. Opens in new windowImage of the project for group 3. Opens in new window