SlideShow

  • Preparing Subgrade for Construction of Median
  • Paving
  • Pervious Concrete Sidewalk
  • Rebuilt 176th & 22nd Intersection
  • 176th & 22nd Intersection: Placing Crushed Rock
  • 176th & 22nd Intersection: Placing Crushed Rock
  • Rebar for Cast-in-Place Concrete Wall
  • Paving
  • Installing Pervious Concrete Sidewalk
  • Curb and Gutter Installation
  • Preparing Subgrade with Crushed Rock
  • Cutting Asphalt
  • Storm Sewer Installation at 14th
  • Storm Sewer Installation
  • Storm Sewer Installation at 22nd
  • Placing Plants in the Stormwater Pond
  • Installing Storm Sewer
  • Installing Temporary Signal System
  • Beginning of Clearing and Grubbing
  • Pond Excavation
  • Drilling Shafts for a Soldier Pile Wall
  • Further Pond Excavation
  • Before Construction, Looking at 22 Ave E
  • Constructing Wall B
  • Utility Work
  • Installing Wall 'H'

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to PWU - CRP - 176th St E (14th Ave E to Waller Rd E) photos